At the moment failed jobs cannot be automatically removed from FFCore as we do not want to remove jobs that presumably require an operator to do something.
If you want to remove them all at once, select the Failed Jobs tab in the FFCore UI and use the Delete All button at the bottom to remove all Failed jobs with a single operation.
But all "fault jobs" are never deleted ! How can I set this delay in FFcore ?
Thanks
Once a day FFCore will automatically purge jobs that have completed successfully. There's no need to configure anything.
I cannot see a way to delete finished jobs automatically in Freeflow core. Earlier versions of Freeflow process manager had this feature. Completed jobs wold autodelete after a specified period.
I have pages and pages of completed jobs in my system. Why the heck would this not be automated? I cannot have someone log in each day just to deleted 1000's of finished jobs. It is a serious waste of resources.
Has anyone fugured out how to autodelete the completed jobs? Anyone else have this problem?