One can highlight a node. Then hold the Shift key and click to the end of thenodes of interest. Then hit Control-C. Then highlight the node connector where the string of copied nodes is to be dropped, then Control-C. See below:
Is it possible to duplicate an entire execution path in a workflow?
I'm building a workflow to output 20+ print files, just with different watermarks.
Thank you!