DavidU54339-XRX
FreeFlow Production Workflow Moderator
FreeFlow Production Workflow Moderator

Re: Migration from 6.0 to 6.1 and join node not working

This should not be happening. I assume the Workflow with the "problem" Join node was migrated from 6.0 to 6.1.1. You could try building an equivalent WF from scratch on the 6.1.1 system. Also a system restart might work. If this does not work contact Xerox support.

0 Kudos

Re: Migration from 6.0 to 6.1 and join node not working

To day it worked also the join node:-)
0 Kudos

Migration from 6.0 to 6.1 and join node not working

Hi due to the Server version and capasity of our FFCore 6.0 server I have installed 6.1.1 on a new server.

But the Max workflow using a join node fails last attempt join.

 

How do I get arround this.

Also I am using an external SQL and both the Old and New FFCore uses the same database, which gave me a lot of problem starting the Old FFCore upgain.

Will adding a Instance name on 6.1.1 installation create a new Database leving the 6.0 DB intact, that I can go back to this untill 6.1.1 function.

Regards

 

Niels-Martin

 