cancel
Showing results for 
Search instead for 
Did you mean: 
rdanough New Member
New Member

Route by multi up status

We have a workflow set up to produce jobs 2-up for roll to roll printing. Some of our jobs are already 2-up when they come to us. How can I tell Core to detect whether the job is already 2 up and if so, route the job directly to the print destination?

0 Kudos
1 Reply
FreeFlow Production Workflow Moderator DavidU54339-XRX
FreeFlow Production Workflow Moderator

Re: Route by multi up status

FFCore is not going to be able to ascertain that the PDF is pre-imposed. If the pre-imposed PDFs are of a different pages size this could be the Route criteria used. You could also use MAX submission and add a MAX "Impose" variable for "2up" vs. "1up" for each PDF submission. The Route node could then use the MAX variable for decisions.

0 Kudos